1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
Binance app download Play Store-APP, download it now, new users will receive a novice gift pack.
1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
836.43MB
Check917.82MB
Check631.62MB
Check236.88MB
Check562.37MB
Check654.48MB
Check931.33MB
Check139.71MB
Check495.58MB
Check778.34MB
Check955.72MB
Check986.76MB
Check535.19MB
Check491.14MB
Check988.16MB
Check376.23MB
Check451.86MB
Check813.14MB
Check858.77MB
Check545.99MB
Check293.16MB
Check578.59MB
Check936.32MB
Check369.48MB
Check826.55MB
Check778.17MB
Check548.28MB
Check678.66MB
Check273.61MB
Check448.39MB
Check288.28MB
Check453.59MB
Check554.98MB
Check752.83MB
Check474.95MB
Check354.32MB
CheckScan to install
Binance app download Play Store to discover more
Netizen comments More
1056 一笑倾城网
2025-01-23 01:58 recommend
1512 鸿爪雪泥网
2025-01-23 01:53 recommend
1082 草菅人命网
2025-01-23 01:30 recommend
2179 设身处地网
2025-01-23 00:45 recommend
2449 说长道短网
2025-01-23 00:29 recommend